The next steps were all Tony, I may have held up a piece or two of drywall but that was the extent of my helping. The project was slow coming so that was the benefits of being 8-9 months pregnant at the time. So Tony enlisted the help of some friends to do the ceiling and hang most of the drywall.
 |
| Nate helped hang the ceiling, now theres insulation up there to hold in some heat. |
 |
| wires all ready for a light fixture. |
 |
| RJ helped with the drywall |
 |
| There were a few beer breaks |
 |
| But the room got drywalled. |
 |
| Check out that pretty wall paper in the hallway...its oh so beautiful! |
 |
| And this is how I was looking the day of drywall. |
0 Reader Coments:
Post a Comment
show some love?